It is also difficult to achieve the specified gap in the horizontal overlap.
Gaps between hardi plank siding.
High moisture at time of installation is going to give gaps.
If siding butt joint gaps are due to shrinkage the central problem is one of shrinkage that occurs principally if the siding was not stored properly prior to installation particularly if it got wet.
This is a common mistake and so easy to avid.
In contrast caulk manufacturers specify a minimum gap at butt joints which can become more visible as the caulk ages.
When james hardie siding products butt into wood based materials a 1 8 gap will allow for expansion and contraction of the wood based product.
During my time working for james hardie i very rarely got calls from homeowners that wanted to submit a warranty claim for their hardie siding.
Remember that most hardie siding problems are caused by improper installation.
Hardie siding requires a minimum 2 gap from all hard surfaces like decks or rooflines and at least 8 from any soft surfaces like grass dirt or gravel.
Double wall construction single wall construction.
Run the siding to the hardietrim board leaving a 1 8 in.
The bottom of the siding should be kept even with the bottom of the trim or if desired the trim may extend below the bottom of the siding.
3 8 from plank edge leave 1 8 gap between plank and trim then caulk weather resistive barrier plywood or osb sheathing.
But the siding should never hang below the trim.
James hardie recommends butting field joints together in moderate contact to achieve a continuous looking joint.
Leave a 1 8 gap between the siding and the trim or other materials to allow for structural movement.
James hardie recommends the use of caulks and sealants that remain permanently flexible.
Gap between the siding and trim.
Do not caulk between siding and any built in receiving channels located at or around windows.
The boards would shrink a little bit making the gap 3 16 to 3 8 depending on how much moisture was in them and how close the install gap was to 1 8.
When james hardie siding products butt into wood based materials a 1 8 gap will allow for expansion and contraction of the wood based product.
10 years ago the installation directions called for an 1 8 gap and then caulk.
James hardie recommends the use of caulks and sealants that remain permanently flexible.
16 or 24 on center let in bracing weather resistive barrier fastener 1 4 thick lath strip moderate contact or maximum 1 8 gap.
Flashing installed incorrectly or siding installed without the proper gap between the siding and flashing will both result in water damage and a voided warranty.
Always caulk between the siding and the trim.