If there is a roof leak the insulation will be damaged by the water leaving you with less insulating value.
Gap between roof sheathing and batt insulation.
The moisture is held in place by the insulation which allows for damage to the framing and other building components.
Press the poly into the sealant.
Ensure that proper ventilation is maintained below the roof sheathing from the soffit vents to the ridge vent at the peak of the roof.
Tape the seams in the poly with sheathing tape.
In addition to the air permeable insulation installed directly below the structural sheathing rigid board or sheet insulation shall be installed directly above the structural roof sheathing as specified in table r806 5 for condensation control.
Seal the gap between the bottom plate of the wall and the floor with acoustical sealant or caulk.
The air impermeable insulation shall be applied in.
Vented roof sheathing.
Generally spray foams have to be applied by a professional.
The code calls for a minimum of 1 in.
This is best accomplishing by installing baffles on the underside of the roof sheathing in between every rafter prior to installing insulation between the rafters.
First the easy stuff.
Unless you re bulk filling rafter bays between 2 10 or 2 8 rafters with closed cell spray foam this approach.
The problem arises with moisture.
Air impermeable and air permeable insulation.
For best performance the airspace in the vent chute should be a minimum of 2 in.
However it is considered good practice to leave a 1 8 gap between sheets and that is also recommended by apa but it is not required.
Apply a 2 inch layer of spray foam insulation r 10 to r 12 directly to the interior surface of the roof sheathing.
T he problem with the insulation against the sheathing expands.
Use special airtight electrical boxes see photo tip 5 or seal the poly to the electrical box with acoustical sealant.
Updated on april 8 2016.
In older buildings the usual method is to install fiberglass batts or cellulose on top of the leaky ceiling with a gap of a few inches or sometimes a few feet between the top of the insulation and the roof sheathing.
This will keep the surface warm and help minimize condensation.
Synthetic stucco photograph 8.
Providing an air gap between the stucco cladding and the exterior face of the foam sheathing prevents the debacle we got with face sealed exterior insulated finish systems a k a.
Let s look at stucco cladding over foam sheathing over osb sheathing.
Actually panels marked sized for spacing simply mean that they are slightly smaller to allow for the recommended 1 8 gap see attached apa tt 055.